©2019 by Imperium Solutions, LLC.

On these domestic projects, we were a critical partner for both the EPC and the end users to develop a control system on an expedited schedule. We were also asked to assist heavily in the startup and commissioning for I & E and the control system architecture. We designed the control system and developed the software as the plant was being constructed which allowed for the fasted known time to production.

 

FACILITY #1

  • 460 MMSCFD

    • (2) 200 MMSCFD and (1) 60 MMSCFD

    • Exterran and UOP Cryo

    • Allen-Bradley/Rockwell Automation​

      • BOP - ControlLogix​

      • Module Equipment - CompactLogix/MicroLogix

      • Network - Stratix 5400/5700 redundant fiber backbone

    • Wonderware

      • Historian​ (~25k Tags)

      • AccessAnywhere - 10 Clients

      • RDP - 10 Clients

      • NAD​

FACILITY #2

  • 600 MMSCFD 

    • (3) 200 MMSCFD trains

      • UOP Russell Cryo

      • Medium voltage switchgear

        • Toshiba​

        • (1) VFD used for (2) Compressors

      • Allen-Bradley/Rockwell Automation​

        • BOP - ControlLogix​

        • Module Equipment - CompactLogix

        • Network - Stratix 5400/5700 redundant fiber backbone

      • Wonderware

        • Historian​ (~22k Tags)

        • AccessAnywhere - 8 Clients

        • RDP - 5 Clients

        • NAD​

IMG_0517.JPG

FACILITY #3

  • 120 MMSCFD Facility consisting of (1) train

    • Cameron Cryo​

    • Nitrogen Rejection Unit

    • Allen-Bradley/Rockwell Automation​

      • BOP - ControlLogix​

      • Module Equipment - CompactLogix

      • Network - Stratix 5400/5700/ControlNet/DeviceNet

    • Wonderware​

      • AccessAnywhere - 6 Clients

      • RDP - 5 Clients

      • NAD​